Same type, similar price · Headphones
Nedis TV Hi-Fi Headphones Over Ear Stereo Long Lead 6m… vs Fysic Stereo TV Headphones, In-Ear with In-Line Volume…
Both cost £19.59 today.
Side by side
| Nedis TV Hi-Fi Headphones Over Ear Stereo Long Lead 6m… | Fysic Stereo TV Headphones, In-Ear with In-Line Volume… | |
|---|---|---|
| Lowest total price | £19.59 | £19.59 |
| Price range | £19.59 | £19.59 |
| Stores selling it | 1 | 1 |
| Cheapest at | Boxed2me | Boxed2me |
| Free delivery | No | No |
| In stock | No | No |
| Lowest price recorded | £19.59 | £19.59 |
| Average price | £19.59 | £19.59 |
| Highest price recorded | £19.59 | £19.59 |
| Brand | Nedis | Fysic |
| Type | Headphones | Headphones |
| EAN / MPN | 5412810304905 / A-CAB222074 | 8712412581900 / NED-727106 |
Where to buy
Nedis TV Hi-Fi Headphones Over Ear Stereo Long Lead 6m…
Fysic Stereo TV Headphones, In-Ear with In-Line Volume…
Ad: we earn a commission from some stores when you buy through our links. It never changes the order, which is by total price.
More comparisons of this type
- EarFun Air Pro 4 - Glossy White£79.99EarFun Air Pro 4 - Black£79.99
- EarFun Air Pro 4 - Glossy White£79.99EarFun Air Pro 4 - Royal Blue£79.99
- Imperial bluTC active 1 Bone Conduction Headphones Black£39.19Imperial bluTC active 2 Bone Conduction Headphones Black£44.09
- Nedis Wired Earphones | 3.5 mm | Cable length: 1.20 m | Volume control | Black£5.18Nedis Wired Earphones Headphones with Microphone, 3.5 mm, Rope Length: 1.20 m, Black£6.85
- Nedis PC Headset | On-Ear | Stereo | 2x 3.5 mm | Fold-Away Microphone | Black£5.38Nedis PC Headset | On-Ear | Stereo | 2x 3.5 mm | Fold-Away Microphone | Blue£7.34
- Nedis PC Headset | On-Ear | Stereo | USB Type-A / USB Type-C™ | Fold-Away Microphone | Black£31.35Nedis PC Headset | On-Ear | Stereo | Bluetooth | Fold-Away Microphone | Black£43.11
- Sonos ACE-WHITE£289.97Sonos ACE-BLACK£349.00
- Sonos ACE-BLACK£349.00Sonos ACEULWW1£399.00















